top of page

Arglass
Valdosta, GA
$123 million multi-building new glass manufacturing facility. Mainstay was responsible for the structural design of foundations and slabs for these Pre-Engineered Metal Buildings. The furnace building was designed with an elevated floor system that includes a concrete slab and composite steel floor framing systems.
The furnace foundation has pile pile-supported mat foundations for the vertical support of the furnace equipment. The furnace exhaust stack foundation was designed with a simple spread mat foundation.
The batch building is a 90 ft structure with partial floors thru to support equipment and silos.
​
The furnace stack is 131 ft tall.



bottom of page